CCCD-7C side loader forklifts with Chaochai engine,2 stage 3.5 meter mast,1370mm fork is USD60000 FOB Shanghai
A 40ft HQ container can hold 1 unit with cabin,fork disassemble.
Delivery: 45 days after payment.
Sailing time from Shanghai to Dubai is 30 days.
Warranty: 1 year
Rated Load(center of gravity of 0.6m place) | 7000㎏ |
Max lifting height | 3.6m |
For free lifting height | 0.4m |
Max lifting speed(full load) | ≥0.3m/s |
Travel speed | Good road | Forward I | 11km/h |
| | Forward II | 26km/h |
| | Reverse | 11km/h |
Fork tilt angle up/down | 5°/3° |
Min turning radius(outer side) | 4.8m |
Max torque force | 39.8KN |
Gradeability | 20% |
Ground clearance | 0.18m |
Overall size | Length | 5.3m |
| Width | 2.2m |
| Height | Fork lowered | 3.07m |
| | Fork upper | 4.85m |
wheel base | 3.05m |
tread | 1.886m |
Platform height | 0.99m |
Platform width | 1.405m |
Platform length | 1.35m |
Fork space | 1.167m |
Battery | 6-QA-135 2 24V |
Tyres | Double rear tyre 9.00-16-14PR air pressure 7.5kg/cm2 |
Operating weight | 12000kg |
Engine | Model | CY6102BG-E2 |
| power(kw/rpm) | 81/2500 |
| Max torque/turning speed(N.m/rpm) | 353/1500 |