Introduce:
GY-200-1A engineering drill is adopted with hydraulic pressure feeding structure, it can proceed attacking and gyrating drilling, and is used for engineering geological exploration in road,railway,bridge foundation,dam site,well,prospecting or industrial and civil architecture. It can also used in anchor rod engineering.
|
Basic Parameters |
|
Model |
GY-200-1A |
|
Drilling Depth |
200m |
|
Opening Hole Diameter |
300mm |
|
Drill Pipe Diameter |
50mm |
|
Weight including the diesel |
850kg |
|
Dimension L*W*H |
1820*980*1400mm |
|
Swivel Head |
|
Spindle speed |
Forward |
900 475 388 205 157 68 r/min |
|
Reverse |
256 85 |
|
Maximum Torque |
2000 N*m |
|
Drilling Travel |
450mm |
|
Mobile Oil Cylinder Stroke |
400mm |
|
Maximum Cylider Driving Force) |
29,000N |
|
Maximum Cylider Lifting Force) |
39,000N |
|
Lifer |
|
Lifting Capacity Single Pipe, Low Speed |
30,000N |
|
Bobbin Line Speed,2 layers |
0.27 0.64 0.83 1.58 1.64 m/s |
|
Rope Diameter |
12.5mm |
|
Rope capacity) |
30m |
|
Tower |
|
Type (L*W*H) |
2.4*2.2*7.2M |
|
Weight |
550KG |
|
Drilling Angle Capacity Of The Tower |
0---90' |
|
Lifting capacity |
6.8M/T |
|
Drive motor |
|
Type |
ZS1110 Diesel |
|
Rated power |
13.2kw | |